Notice: Function WP_Block_Patterns_Registry::unregister was called incorrectly. Pattern "twentytwentyfour/hidden-post-meta" not found. Please see Debugging in WordPress for more information. (This message was added in version 5.5.0.) in /home/northberkshire/wesmc.org/wp-includes/functions.php on line 6170
MBTA Signal System Gets 295 Million Upgrade – West End Sentinel

Documentation of the MBTA’s crumbling signal infrastructure highlighted the massive investment required to modernize it. The 295 million dollar project will replace obsolete equipment across the subway network.

Engineers say the current system dates back decades and is increasingly prone to failure. The upgrades are expected to improve both safety and on-time performance.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/northberkshire/wesmc.org/wp-includes/functions.php on line 5493